• Exterior
    Tredegar Square, Mile End
  • Private Rear Garden
    Tredegar Square, Mile End
  • Drawing Room
    Tredegar Square, Mile End
  • Original Fire Place
    Tredegar Square, Mile End
  • Views of Tredegar Square Gardens
    Tredegar Square, Mile End
  • Kitchen
    Tredegar Square, Mile End
  • Reception Room
    Tredegar Square, Mile End
  • Bathroom
    Tredegar Square, Mile End
  • Landing/Stairwell
    Tredegar Square, Mile End
  • Bedroom
    Tredegar Square, Mile End
  • Second Bathroom
    Tredegar Square, Mile End
  • Bedroom
    Tredegar Square, Mile End
  • Bedroom
    Tredegar Square, Mile End
  • Private Rear Garden
    Tredegar Square, Mile End
  • Tredegar Square Gardens
    Tredegar Square, Mile End
  • Tredegar Square, Mile End
  • Tredegar Square, Mile End
  • Tredegar Square, Mile End
  • Tredegar Square, Mile End
  • Tredegar Square, Mile End
  • Tredegar Square, Mile End
  • Tredegar Square, Mile End
  • Tredegar Square, Mile End
  • Tredegar Square, Mile End
  • Tredegar Square, Mile End
  • Tredegar Square, Mile End
  • Tredegar Square, Mile End
  • Tredegar Square, Mile End
  • Tredegar Square, Mile End
  • Tredegar Square, Mile End

Tredegar Square, Mile End
£1,975,000 (Tenant Fees)

5 2 2
  • Stunning Grade II Listed Georgian Home
  • Overlooking Tredegar Square Gardens
  • 2072 sq ft / 192 sq m
  • 72 ft Rear Garden
  • Array of Superb Public Transport Connections Including Mile End Tube Station
  • Nearby to Victoria Park and the Regent's Canal
5 2 2
  • Stunning Grade II Listed Georgian Home
  • Overlooking Tredegar Square Gardens
  • 2072 sq ft / 192 sq m
  • 72 ft Rear Garden
  • Array of Superb Public Transport Connections Including Mile End Tube Station
  • Nearby to Victoria Park and the Regent's Canal

Tredegar Square, Mile End £1,975,000 (Tenant Fees)

WJ Meade are delighted to exclusively present this exceptional Grade II Listed Georgian townhouse, gracefully positioned on the prestigious East Terrace of the highly sought-after Tredegar Square.
Dating back to the 1830s, this magnificent five-storey residence is a fine example of Georgian architecture and timeless elegance, with the current owners having lived there for over three decades, the property offers an outstanding opportunity to acquire a substantial family home in one of East London's most desirable squares. Extending to 2072 sq ft, the accommodation is both generous and versatile, comprising five- bedrooms, two bathrooms, eat-in kitchen, separate utility room, elegant reception room, and a magnificent drawing room enjoying picturesque views across Tredegar Square. A dedicated study/home office provides additional flexibility for modern family living. The property will benefit from some refurbishment including attention to damp. To the rear, a beautifully sized private garden extends approximately 72 ft, offering a tranquil outdoor retreat. Offered on a chain free basis


EPC

Click to enlarge

EPC

Floorplans

Click image to enlarge:

Tredegar Square, Mile End
Status: For Sale
Tenure: Freehold
Council Tax: G
Available: NOW
Ref #: 7166

Gallery

Click image to enlarge:

Popular Properties

Jack Clow Road, Stratford

£299,000

  • 1
  • 1
  • 1

WJ Meade are pleased to offer this top floor one bedroom apartment, arranged over 466 sq ft with a separate fitted kitchen to reception. Located in a low-rise private development on a residential...

St. Pauls Way, Mile End

Offers In Excess Of £450,000

  • 2
  • 2
  • 1

WJ Meade are delighted to present this impressive top floor, two bedroom apartment featuring a 20 ft balcony looking across the rooftops of East London towards the Canary Wharf Cityscape. Enjoying...

Bow Road, Mile End

Offers In Excess Of £1,500,000

  • 4
  • 2
  • 2

WJ Meade are delighted to present this imposing Grade II Listed Georgian townhouse, part of the Tredegar Square Conservation Area. Arranged over four stories amassing 1909 sq ft, with an impressive...

rightmoveonthemarketzooplatpoukala